Westminster
21st Street
Category: Wet & Dry Utility
Services Provided
- Remove and replace street asphalt, Remove and replace 6” curb and gutter
- Construct parkway culvert under sidewalk
- Construct new 4” concrete sidewalk
- Build 6” thick concrete-driveway-approach
- Install new 6” sewer later connection
- Construct 1” water service and meter
- Construct 1’ water back flow preventer
- Install 3” and 4” underground electrical conduits to transformer boxes
- Construction of transformer pads
- Install 3” and 4” electrical conduits from transformer boxes to residence panels